********************************UPDATE*********************
Our issue is that we were not looking at all lines of the on-hand query for the specific lots in question. We were only looking at the records that had physical on-hand inventory. There were additional lines for the same inventory dimensions with the adjusted Financial costs. Summed together and we were able to see the total costs.
***************************************************************
We are trying to understand what should the standard system behavior be for updating on-hand inventory financial cost.
We import product from China so the freight and duties will increase the inventory cost quite a bit once all of the charge adjustments have been made to the original PO. For this type of product, we use FIFO and each item is batch controlled, so we are trying to maintain actual cost by batch. What we are finding is that, after making adjustments to the product PO to include the freight and duty charges, we will perform an inventory recalc. Once that is done, the cost/unit on each transaction of that batch found in the transaction table all get updated correctly. However, we are not seeing the actual on-hand inventory financial cost values get updated. Shouldn't the on-hand financial costs also get recalculated?
One other point is that we also split the original batch into separate pcs as a result of how we manage the inventory of this product, each with their own serial number. So in my example below, we currently have three "lots" of the original batch. After all of the original charge adjustments to the PO, the actual cost per unit should be $0.361, and that is what the transaction table is showing for all transactions of this batch. However, only one of the "lots" is showing this value of the on-hand inventory. The other two "lots" are significantly different:
Batch number |
Serial number |
Inventory status |
Physical inventory |
Financial cost amount |
Cost per unit |
Avg Tranx Cost per unit |
R075516 |
S001505376 |
Available |
28,660.50 |
13,283.23 |
0.463 |
0.361 |
R075516 |
S001637148 |
Available |
3,504.00 |
2,248.86 |
0.642 |
0.361 |
R075516 |
S001695450 |
Available |
2,040.00 |
736.75 |
0.361 |
0.361 |
#FinanceandOperations #SeriesCostAccounting
------------------------------
Lyle Henderson
IT Manager
Beltservice Corp.
Earth City MO
------------------------------