Hi all! We are currently running on AX2009 and we have an issue I can't seem to figure out.
I'll see if I can make this make sense...
We have planned productions for a finished good, a filled intermediate, and a bulk goop. We will consume the entire bulk goop into the Filled intermediate which is then packed into the finished good.
Finished good and filled intermediate SOQ = standard yield for the batch
Issue comes in the MRP nets out the requirements for the bulk; in the filling process we have scrap factors built into the BoM, this will them create a planned prod order to cover the filling, but it also creates a second planned order which is to cover the scrap factor. We do not manufacture this second bulk, we stick with the yield from batch #1.
Are there any set-ups, besides removing the scrap factor in the BoM, that will tell AX not to plan that second unneeded bulk?
I hope I made this clear enough...
#AX2009 #ManufacturingThanks in advance!
-Dave
------------------------------
David Vezmar
Project manager
Dentsply Sirona
Milford DE
------------------------------